Retrofitting Kilton Forest Community Centre

Location

Worksop, Nottinghamshire

Client

Bassetlaw District Council

Building

Community Centre

Project

Deep-energy retrofit

Target

EnerPHit certification

Beattie solution

TCosy™ deep retrofit system

Status

On site

Commencement

Q3 2026

Transforming an existing community building through EnerPHit retrofit

Kilton Forest Community Centre is undergoing a major transformation to create a comfortable, energy-efficient building capable of serving the local community for decades to come.

Originally constructed in the 1970s, the building has had few substantial improvements to its fabric during its lifetime. Rather than demolishing and replacing the existing centre, Bassetlaw District Council is retaining the building and significantly upgrading its energy performance.

Beattie is delivering the external deep-energy retrofit, targeting EnerPHit certification – the Passivhaus standard developed specifically for the energy-efficient retrofit of existing buildings.

Once the external retrofit is complete, the building will undergo an internal refurbishment before becoming the new home of Worksop charity Centre Place.

Retrofitting Kilton Forest Community Centre
Retrofitting Kilton Forest Community Centre
Retrofitting Kilton Forest Community Centre

Project Overview

Explore the challenges, design approach and technical solutions behind the transformation of Kilton Forest Community Centre into a high-performance building targeting EnerPHit certification.

The existing community centre was constructed more than 50 years ago and its building fabric required significant improvement to meet modern expectations for energy efficiency, comfort and building performance.

The challenge was to substantially improve the performance of the existing building while retaining its structure, extending its useful life and avoiding the need for demolition and complete replacement.

For its future occupier, Centre Place, reducing the energy required to operate a large community building is also important. Improving the fabric should reduce long-term energy demand while providing a more stable, comfortable internal environment.

Beattie is using its TCosy™ deep retrofit system to create a new high-performance thermal envelope around the existing community centre.

Rather than treating individual elements of the building in isolation, TCosy™ takes a holistic, fabric-first approach.

The new structure extends from foundation level, around the existing external walls and across the roof, creating a continuous highly insulated envelope around the building. The system is designed specifically around the existing structure and manufactured off-site, enabling complex existing buildings to be upgraded while supporting relatively rapid installation on site.

At Kilton Forest, the retrofit addresses:

  • significantly improved levels of insulation;
  • exceptional airtightness;
  • thermal-bridge reduction;
  • high-performance windows and doors; and
  • mechanical ventilation with heat recovery (MVHR).

Together, these elements form an integrated high-performance building envelope designed around Passivhaus principles.

The project is targeting EnerPHit certification, the Passive House Institute’s certification standard for the energy-efficient retrofit of existing buildings.

EnerPHit applies the fundamental principles of Passivhaus to existing buildings while recognising the additional constraints associated with upgrading an existing structure.

Detailed energy modelling, careful design and on-site testing and verification are used alongside high levels of insulation, airtightness, high-performance windows and doors, thermal-bridge detailing and efficient ventilation to help ensure the completed building performs as designed.

Kilton Forest demonstrates the potential of deep retrofit as an alternative to demolition and replacement.

By retaining the existing structure, the project makes use of the value already contained within the building while avoiding the additional materials, construction waste and embodied carbon associated with demolition and construction of an entirely new facility.

The result will be a building that combines the existing structure with a new high-performance thermal envelope – extending the useful life of a community asset that has already served the Kilton neighbourhood for more than 50 years.

Following completion of the retrofit and subsequent internal refurbishment, Kilton Forest Community Centre will become the new home of Centre Place.

Established in Worksop in 1996, Centre Place provides services for children, young people and families across Bassetlaw and Nottinghamshire, including its Talkzone Mental Health Service and LGBT+ Service Nottinghamshire.

The refurbished centre will provide the charity with a facility designed around its current requirements and future growth.

Beattie’s external retrofit works began in late August 2026, with completion currently scheduled for early Q1 2027. The internal refurbishment will follow.

Get in Touch

Give our team an email today to find out more.

Other Projects from Beattie

  • Retrofitting Kilton Forest Community Centre

    Retrofitting Kilton Forest Community Centre

    Kilton Forest Community Centre is undergoing a major deep-energy retrofit.

     

  • Haybarn Passivhaus

    Haybarn Passivhaus

    This project showcases the construction of our patented build system over an existing concrete frame, bringing new life to an old structure.

  • Anchorage Passive House

    Anchorage Passive House

    Pushing the boundaries of Passivhaus design and prefabricated construction, Anchorage is a carefully crafted home on the steep riverside in Wyre Piddle.

  • Retrofitting Kilton Forest Community Centre

    Retrofitting Kilton Forest Community Centre

    Kilton Forest Community Centre is undergoing a major deep-energy retrofit.

     

  • Haybarn Passivhaus

    Haybarn Passivhaus

    This project showcases the construction of our patented build system over an existing concrete frame, bringing new life to an old structure.