
Approved Contractor
Creating Enterprise
Units
21
Location
Conwy
Delivery Method
Panel
Key Features
Housing Mix & Tenure
The scheme comprises 21 homes: eight 3‑bed houses, eight 2‑bed houses, four 2‑bed bungalows, and one specially adapted 2‑bed bungalow for wheelchair users. There is a mix of social rent and intermediate rent tenures.
Sustainability & Efficiency
Homes are built to Passivhaus standard: highly insulated, with triple glazing, excellent airtightness, and mechanical ventilation with heat recovery systems. Solar panels are incorporated, and the heating demand is minimised—largely met through passive gains (body heat, solar, electrical appliances) thanks to the Beattie high-performance fabric and build system.
Amenities & Design Standards
All homes have designated parking, electric vehicle charging points, and are designed to meet Welsh Government development quality requirements, inclusive design (wheelchair accessible home), and safe, durable neighbourhood standards





