
Delivered by
Beattie Passive
Client
Cardiff Council
Units
19
Delivery method
Modular
Our solution to the housing and homelessness crisis
Built to Passivhaus standards, these flats provide residents with comfortable homes and reduce CO2 emissions. In addition, the homes are also relocatable.
Haus4 is our award-winning range of modular housing for the homeless. Built to Passivhaus standards of energy efficiency, quality and comfort in as little as 6 weeks, Haus4 modular homes can be installed, ready for occupation, within a matter of hours. In addition, Haus4 is stackable, relocatable and sustainable – with remarkably low running costs. And if you need to achieve Net Zero, look no further!
Passivhaus requires as little as 10% of the energy used by a typical central European building for space heating and cooling. As you would expect, this has a profound impact on heating bills. With Passivhaus, we can end fuel poverty, relieve the burden of high energy bills, and build a brighter and more prosperous future for everyone.
Haus4 modular homes can be built and deployed quickly with no compromise in build quality. In actual fact, the build quality is superior. Our clients can trust that every home we build is manufactured to the rigorous quality requirements of the internationally-recognised Passivhaus standard.


David Jacques Operational Manager, Development & Regeneration at Cardiff Council
Benefits of the scheme
One of the most unique aspects of the Hayes Place, and a key differentiator, is that the whole development is completely demountable, relocatable, and reusable with minimal fuss. That means that when the current development has served its purpose and the need for temporary housing arises elsewhere, these homes can be demounted and relocated as required. The need to construct a brand-new development, along with the associated carbon emissions, can be avoided.